Pornichet La Baule racecourse is renovated with Duralock's racerail

Duralock is proud to take part in the complete renovation of Pornichet La Baule racecourse. The grandstand building was started in 2010 and the first races were organized on the 2nd of July 2011. No less than 5 kilometers of racerail and 700m of crowd barrier were installed by Duralock to give the racecourse the required safety.
Toolbox
Technical Specs
Download dimensions and
details for all our products.
Installation Guides
Download simple step-by-step
installation instructions.
Not sure what you're looking for?
Visit the products page for more information.
Want to arrange installation





