Pornichet La Baule racecourse is renovated with Duralock's racerail

Attention: open in a new window. PDFPrintE-mail

Pornichet La Baule racecourse with racerail fittedPornichet La Baule racecourse with racerail fittedDuralock is proud to take part in the complete renovation of Pornichet La Baule racecourse. The grandstand building was started in 2010 and the first races were organized on the 2nd of July 2011. No less than 5 kilometers of racerail and 700m of crowd barrier were installed by Duralock to give the racecourse the required safety.

Toolbox

Technical Specs

Download dimensions and
details for all our products.

pdf

Installation Guides

Download simple step-by-step
installation instructions.

pdf

Not sure what you're looking for?

Visit the products page for more information.


Want to arrange installation
toolbox footer graphic